Co-location

Important Note!

We have immediate space available for the following equipment:

110 Volt Equipment, Up to 1500 Watt – Five to Ten Spots

208 or 220 Volt Equipment – Five Spots

The rate for these spots is 10.5 Cents CAD per kw/h plus GST.  This rate is valid from now until the end of April 2022.  At that time, the rate will adjust for added costs in cooling your equipment.  Your actual charges are based on the power drawn by your equipment.

To book these spots – email office@83north.ca

We host miners at several facilities.  We are glad to make arrangements to host your miner or farm at one of our locations.  We accept all sizes of clients, from single miners to multiple shelves.

Some of our facilities recycle heat from mining operations for other tenants.  They subsidize our winter rates when they purchase that heat from us.  We do not publicly disclose the location of each mining farm.

We offer 120/240 volt power.  Our basic offering includes shared internet access.  Upgrades are available.  Large farms are quoted on a per case basis.

See our update below for those looking for container solutions!

Location One – “The Farm”
This location is currently fully leased. 

Location Two – “The Jail”
This location is fully leased.

Location Three – “The School”
Our new location is now ready for leasing and miner placement for mid-August 2020.  At current space is available for 150 miners.

When you pay for machine setup, electricity rates can be as low as 4¢ US per kilowatt hour.  Call or email for terms and conditions and to book space.  Prepayment only.

Location Four – “The MegaMine”
Manitoba Hydro has identified three locations in Manitoba where large scale bitcoin mining can be supported.  Discussions are ongoing for interconnection at the third location.  A total amount of power between 15 and 20 megawatts is available.  We are currently seeking investors for a joint venture project to host up to 14,000 miners at this location.  Please contact us for details.

Included Amenities

Shared cable internet.
Equipment setup on shelving (you supply racks for GPUs if required)
Monday – Friday 9A/5P Service Call Outs
Line Stable Power.

Available upgrades:

UPS Conditioned Power.
Remote Reboot.
Dedicated internet.  Cable Service from $70/month.
24/7 Service Call Outs.
Air conditioning: Equipment plus kWh charges for runtime.

Thinking About NFTs?  So are we.

We’re launching a unique NFT product that involves collecting real world items using the digital blockchain.  If you want to partner with us on this project, give us call at 877-734-6044.

Container Solutions

We’ve been swamped with requests for co-location lately.  Most of our spots are full.  Many are asking about locating a full container.  Yes, we do that!

Generally, we provide consulting services for container placement and you benefit by paying the lowest possible electrical costs directly to the utility.  Container placement is available from $200 per month.

Our consulting fee is $6,000 per container.  For that fee you get:

  • Project Management from Start to Mining
  • Progress Updates & Contractor Management
  • Direct Access to Consultants Cell Phone 24/7 for the duration of your project build

We also provide after build support for miner maintenance, upgrading, etc.  Fees are negotiable based on the level of service desired.